Limited FHA 203(k): smaller, non-structural work
This option can cover eligible non-structural work, such as paint, flooring or minor kitchen updates. The total rehabilitation cost limit is $75,000, including applicable fees and reserves. A smaller budget does not make structural work eligible. A HUD-approved consultant is optional. HUD’s Standard and Limited comparison explains the difference.
Standard FHA 203(k): major or structural work
Standard can cover eligible larger projects and structural repairs. Rehabilitation costs must be at least $5,000, and a HUD-approved 203(k) consultant is required. It does not use Limited’s $75,000 ceiling, but the mortgage, value and project rules still limit the loan.
HomeStyle Renovation: a conventional option
HomeStyle can combine eligible work with a purchase or refinance. For a purchase, renovation costs may be up to 75% of the lower of the price plus renovation costs or the appraised value after work. For a refinance, the ceiling is 75% of completed value. Manufactured homes have a separate 50% rule. These are repair-cost calculations, not percentages you can borrow without review. Fannie Mae’s HomeStyle rules explain the calculation.
Match the loan to the home and its use
For an FHA 203(k) home purchase, plan to live in the home. The property and work must fit the program; eligible condo work is limited to the unit’s interior. Ask the lender about the home before signing a work contract. HomeStyle can also allow eligible one-unit second homes or rentals. Fannie Mae’s HomeStyle eligibility guide explains home-use and project limits.
Check the mortgage limit separately from the repair budget
FHA mortgage limits depend on the county, loan year and number of units. A repair allowance is not the total loan limit or the home’s purchase-price cap. Use HUD’s county and unit lookup to check the property. Our South Carolina FHA 203(k) guide explains the program in more detail.
Know how the contractor gets paid
The lender holds the repair funds and releases payments under the approved plan. Inspections and completion checks may be needed before money is released. Ask how changes to the work must be approved. Do not assume you can change the budget or receive the unused money as cash.